BART CCTV Installation at SFIA Bay Area Rapid Transit (BART) | South San Francisco, CA

Project Summary

BART CCTV Installation at SFIA

Upgrade closed circuit television system at BART Station located at the International Terminal

Owner: Bay Area Rapid Transit (BART)
Location: South San Francisco, CA
Design Team: BART
Contract Value: $825,000
Completion Date: February 2016
Duration: 9 Months
General Contractor: Rodan Builders
Related Information
Services

Atlas / Pellizzari Electric teamed up with Rodan Builders and Conti Corporation to build out the infrastructure for a brand new CCTV System located at the BART Terminal at SFO. This included rigid conduit work above and below the platform station, while working through security to reach other areas of the airport. Atlas had to make very detailed and precise work plans to make sure that BART services were not disrupted and remained operational throughout the duration of project.

Information Request

Fill out the form below to let us know more about your project requirements. All fields are required unless otherwise specified.

* = Required Field

  • Drop files here or
    Max. file size: 10 MB, Max. files: 3.
    • This field is for validation purposes and should be left unchanged.
    Our Website uses cookies. Cookies are small text files held on your computer that help us understand how you use our Website. Our cookies do not store any personal information about you, and you can delete and block cookies via your browser settings at any time. By clicking “Ok” you agree to accept our use of cookies.