Atlas / Pellizzari Electric teamed up with Rodan Builders, Project Frog, and SVA architects to design and build (5) new classroom buildings located on 4 school sites. The buildings included 6, 8 and 12 classrooms. Our work included site infrastructure, lighting, controls, pre-fab wiring, voice / data, clock / speaker, and fire alarm systems. These pre-fabricated buildings are built very fast and efficiently which speeds up the overall construction time and is a huge selling point for school districts.