Five Points Utility Connected Solar Farm

New 15 Megawatt Photovoltaic Solar Farm built for PG&E and connected to utility grid.

Owner: PG&E
Location: Five Points, CA
Design Team: PG&E
Contract Value: $6,000,000
Completion Date: October 2012
Duration: 6 Months
General Contractor: Millender White
LEED Status: LEED® Certified
Related Information
Core Market
Services

Atlas / Pellizzari Electric teamed up with Milender White to build a 15MW photo voltaic utility farm for PG&E. Located in Five Points, CA, this project was part of a 5 year, 250MW renewable energy initiative mandated by the State of California, and consisted of a 1 square mile site that connected into the high voltage utility grid. Altas / Pellizzari was responsible for the entire electrical infrastructure, including AC high voltage interconnect, power inverters, DC string wiring, a grounding system, underground trenching, service pads, and overall system startup. Due to the project being on a fast track, an average of 30 electricians were needed over a 6 month period to complete it. 

Project Highlights

  • 15 MW (ac) / 18 MW (dc)
  • 162 acre site
  • 75,528 PV modules
  • 240 combiner boxes
  • 1,642 racks
  • 8,210 piles
  • 278 miles of wire
  • 20 miles of fiber optic

Photo Gallery  (4)

Information Request

Fill out the form below to let us know more about your project requirements. All fields are required unless otherwise specified.

* = Required Field

  • Drop files here or
    Max. file size: 10 MB, Max. files: 3.
    • This field is for validation purposes and should be left unchanged.
    Our Website uses cookies. Cookies are small text files held on your computer that help us understand how you use our Website. Our cookies do not store any personal information about you, and you can delete and block cookies via your browser settings at any time. By clicking “Ok” you agree to accept our use of cookies.